Huiyano design and construction ———— constantly new to meet the needs of customers in different industries

 

Laboratory research and development, design, production, construction, installation, after-sales

Domestic high-quality environmental protection laboratory design and construction services manufacturers

Journalism
What should be paid attention to in the purification project of GMP workshop
2021-05-12

GMP workshop purification project is a set of scientific product quality management system, which is usually applicable to food manufacturing and drug manufacturing industries. In order to meet the corresponding product requirements in the production process of food or drugs, or better improve the efficiency of products, we need to pay attention to the following and points when building a GMP workshop purification project.

First, the workshop must be reasonably zoned according to the product production process and precautions. The rationality of the place of origin of the workshop shall be ensured to avoid crowded pedestrian flow.

Second, the entrances and exits of personnel and materials in GMP workshop must be set separately, and the entrances and exits of raw materials and finished products must also be set separately. In this way, mutual contamination between the finished product and other materials can be avoided. At the same time, the access of workshop personnel shall be strictly controlled to prevent irrelevant personnel from entering and leaving the workshop.

Third, in the workshop, rooms with different cleanliness should be reasonably planned and arranged. Rooms with high cleanliness should be planned in places with few personnel, and it is best to be close to the air conditioning room. Rooms with different cleanliness are arranged according to the decreasing cleanliness, usually from inside to outside. Rooms with the same cleanliness should be planned and arranged in the same area, so as to avoid mutual pollution between rooms with different cleanliness.

Fourth, the GMP workshop should reduce the placement of unnecessary objects. It is best to place only necessary mechanical equipment in the workshop, and there are minimum requirements for the number of staff in the workshop.

The preliminary planning of purification work in GMP workshop is very important. After you contact the supplier, you can finally implement the purification project in place only after you have made the corresponding planning scheme with the supplier.